TK Water Solutions Sdn Bhd
EDI Systems in Johor Bahru Start with the RO Feed
A buyer’s checklist for matching an EDI system to RO permeate quality, production demand, site utilities and measurable acceptance criteria.

In Johor Bahru, a plant can have its RO train running and an EDI skid pencilled into the next purchase before anyone checks whether the permeate suits the proposed unit. Choose by matching feed-water quality and required product flow to the system’s operating limits, then check utilities, drains and acceptance criteria before committing.
Define the water the plant needs
Start with the job at the outlet. Record the required product-water flow in cubic metres per hour, whether demand is steady or comes in production peaks, and the quality target at the point where the water is used. A boiler make-up line, a rinse header and a laboratory supply may call for different flow patterns and product-water limits.
State the target in measurable terms. For example, specify the required resistivity or conductivity, the temperature at which it should be measured, and whether the value applies continuously or at a particular operating condition. Resistivity readings vary with temperature, so the quotation and the site instrument should use a consistent reference, commonly temperature compensation to 25°C.
TK Water Solutions Sdn Bhd specializes in EDI systems, and its product catalog includes configurable RO EDI systems. EDI, or electrodeionization, uses ion-exchange media, selective membranes and an electric field to remove ions from water; it is commonly considered as a polishing stage after reverse osmosis.
Before comparing configurations, prepare a short process brief:
- Required average and peak product flow, with operating hours per day.
- The product-water quality target and the sampling point where it will be checked.
- Whether demand is continuous, intermittent or tied to particular production shifts.
Check the RO permeate against the EDI limits
The feed analysis is one of the items buyers most often leave until late. EDI performance depends on what reaches the stack, not just on the nameplate capacity. Gather recent RO permeate results for conductivity, hardness, silica and carbon dioxide where available, and include temperature and any known variation between operating periods.
Hardness and silica can contribute to deposits, while dissolved carbon dioxide adds ionic load even when the upstream RO is producing water that appears low in conductivity. Ask the supplier to identify the allowable feed range for each parameter and compare it with actual results. A single sample may miss changes caused by a different source-water blend, an RO cleaning, or a shift in operating conditions.
Include a dated laboratory report or a set of routine plant readings, with units and sample points. If the plant only has conductivity data, say so and ask which additional measurements are needed before unit selection. Do not treat an EDI product-water target as proof that the unit can accept any RO permeate; the feed limits and required pretreatment must be checked for the specific system.
- Attach the RO permeate analysis and identify where the sample was taken.
- Note any recent changes to the RO train, cleaning regime or feed-water source.
- Ask which feed parameters have limits and how the selected configuration handles a result outside them.
Walk the proposed skid location before ordering
Check the plant services at the actual installation point. Record the available electrical voltage, phase and frequency rather than assuming the control panel will match the site supply. Confirm the required connection, isolator and space for the rectifier or power supply; EDI needs a controlled direct-current input as well as the plant’s normal electrical supply.
Map the water connections and drains on the floor plan. The product, feed and concentrate lines each need a route, and the concentrate stream needs a permitted drain or return arrangement suited to the process. Note the pipe sizes, connection types and the distance to the nearest drain so that a late pipework change does not hold up installation.
In a warm, humid plant room, check ventilation and the space around the electrical enclosure as well as the skid footprint. Leave access to open doors, read the control display and remove components for maintenance. A unit that fits between two pipes may still be awkward to service if a cable tray blocks the panel or there is no room to reach a valve.
- Photograph the supply point, nearby pipes and floor drain; record connection sizes and types.
- Measure the skid footprint and service clearance, including panel-door swing and access to valves.
- Confirm concentrate routing, electrical requirements and the room’s ventilation conditions.
Make the quotation answer the same questions
Two EDI quotations are difficult to compare when one assumes a different feed analysis or measures product quality under a different condition. Ask each supplier to state the design feed range, product flow, operating temperature and product-water target used for its selection. Have the quote identify included equipment such as the stack, power supply, instruments and control panel, then mark any site pipework or electrical work that sits outside the package.
Set out the acceptance check before purchase. Write down where the product sample will be taken, what instrument or laboratory method will be used, how temperature will be handled, and how long the unit must operate at the agreed flow before readings are accepted. If the target is resistivity, state the reference temperature; if it is conductivity, state the units and measurement point.
Also ask for the operating requirements that affect day-to-day ownership: normal feed and concentrate flows, alarms that stop production, routine inspection points, and the recommended spare parts for the selected model. A clear schedule makes it easier for operations, engineering and purchasing to review the same offer and see what the site must prepare before commissioning.
- Compare quotations at the same feed analysis, product flow and quality target.
- Write the acceptance measurement, sample point and temperature reference into the purchase specification.
- Confirm package boundaries, site connections, alarms and model-specific spare parts.
Frequently asked questions
What water analysis should I send before buying an EDI system?
Send recent RO permeate results for conductivity, hardness, silica and carbon dioxide where available, along with temperature, units and sample point. Include production flow needs and note any changes in feed source or RO operation. The supplier can then compare the actual feed with the proposed unit’s stated limits.
Does an EDI system replace reverse osmosis?
Usually, EDI is considered as a polishing stage after RO rather than a substitute for it. RO reduces much of the dissolved load before water reaches the EDI stack. The right process arrangement depends on the feed-water analysis and the quality and flow required at the point of use.
The sound purchase starts with a dated RO permeate analysis, a defined product-water target and a site walk that checks power, pipework, drains and maintenance access. Put the feed limits and acceptance measurements into the same specification used to compare quotations.
Related articles: 5 Price Drivers for Filter Cartridges in Taman Taming Jaya · Filter Housing Taman Johor Jaya: Measure Before You Replace